Data feed integrations is a great tool. But the dates are static. The hard-coded behavior is:
- Data feeds run every 60 minutes until 2 days before the event.
- After that, the data feeds begin to run every 20 minutes, until 1 day after end date.
- After the end date, the data feed runs every 60 minutes again until 30 days after the event’s end date.
Our org needs the data feed to run beyond 30 days after the end date. There should be configuration options for the dates of the integration.
Comments
0 comments